Paulding County, GA
Zoning limits generators at data centers to emergency backup and testing; 'emergency' is not defined.
Likely no gas route.
Permitted plant: Likely no (Emergency-only rule)Rentals under 12 months, no air permit: Likely no
Paulding County, GA's data center zoning standard says: "With the exception of testing activities, generator use is limited to emergency backup use only." (UDO Sec. 220-40.12(4)). The ordinance does not define 'emergency' or 'backup' and does not separately bar other on-site generation. We read it as barring a generator fleet that runs 24/7 or as bridge power while a site waits for a grid connection, because that is neither emergency nor backup use (our reading). It does not meet the skill's block test on its own text. Ordinance 2025-06 was signed Sept 9, 2025 (5-0) and is effective upon passage. Testing is capped at 2 hours a day, weekdays 11 a.m. to 5 p.m. The scanned redline was checked on the rendered page: the clause is underlined (added), not struck. Whether data centers are allowed outside the overlay was not checked.
Permitted gas generation
Generator use other than testing is limited to emergency or backup use. Whether a wait for grid service counts as an emergency is not stated (our reading: it does not).
Rentals kept under 12 months
The limit applies to all generator use on the site and does not distinguish owned from rented units. We read it as covering rented units (our reading; the text does not name them). Source
Details
- Who it covers
- data centers in the Technology Park Overlay District (areas of 50 acres or more)
- Where
- Unincorporated Paulding County only
- Status
- In force
- Effective
- September 9, 2025
- Authority
- Paulding County, GA (Board of Commissioners, Sept 9, 2025; Ordinance No. 2025-06)
- Last checked
- November 8, 2026
Sources