Zoning bars on-site generation at data centers; generators only as backup to the borough's own utility.
No gas route.
Permitted plant: No (Zoning ban)Rentals under 12 months, no air permit: No
Blakely's zoning allows data centers only as a conditional use in the DT Overlay zone, and Section 775.G says: "No on-site electrical generation is allowed." Backup generation is allowed. The borough-wide definition of a generator adds that generators "shall not be used for primary power only as a backup to the borough electrical distribution system." A data center must take its power from the Blakely Borough Electric Light Company, and the applicant must provide a certification from the regional transmission organization that sufficient power is available. Generators may not be used for peak shaving or demand response. "Backup" is not defined, but running a gas fleet while waiting for the borough to serve the load would be primary power, which the text bars (our reading).
Permitted gas generation
'No on-site electrical generation is allowed' at data centers (Sec. 775.G), and generators may serve 'only as a backup to the borough electrical distribution system' (definition, Sec. 302). Power must come from the Blakely Borough Electric Light Company (775.H).
Rentals kept under 12 months
The generator definition expressly includes portable units, and the data center section bars on-site generation outright. Source
Details
- Who it covers
- major (over 10,000 sq ft) and minor data centers, conditional use in the DT Overlay zone only
- Where
- Blakely Borough only
- Status
- In force
- Effective
- September 21, 2026
- Authority
- Blakely Borough Council, Lackawanna County, PA (data center rules first adopted Nov 17, 2025 per press; zoning ordinance with amendments readopted Sep 21, 2026)
- Last checked
- November 8, 2026
Sources
- Blakely Borough Zoning Ordinance (Ord. 8 of 2026, adopted Sep 21, 2026), Sec. 775.G primary
No on-site electrical generation is allowed. Backup electrical generation is allowed by Schedule I with all applicable rules applying including Section 809.
- Same, Sec. 302 definition of 'Generator (Fuel or Battery Powered)' primary
Such generators may be permanently installed or portable ... Generators shall not be used for primary power only as a backup to the borough electrical distribution system.
- Same, Sec. 775.H and Sec. 111 primary
The data center shall receive electrical power from Blakely Borough Electric Light Company ... This Ordinance was duly adopted at a public meeting of the Blakely Borough Council held on September 21, 2026
- Fox56, Blakely Borough council approves zoning overlay for data centers (Nov 2025) secondary
For information only, not legal advice. Confirm with your air agency and fire marshal before you rely on it. Spot an error? Email tyler@relayenergy.us.